INFRA 2012
18e édition
19 au 21 novembre 2012
Hôtel Omni Mont-Royal, Montréal
Ce produit contient une capsule vidéo et une présentation PowerPoint.
Conférenciers : Brij B. Goyal, Eng. et Igor Y. Maevski, Eng., Jacobs Engineering
Document en langue anglaise - English version
The presentation will outline some of the major obstacles that were overcome during the planning, design and construction of the Central Artery/ Tunnel (CA/T) Project, commonly known as “Big Dig”, in Boston. The lessonslearned are typical for urban tunneling and are very relevant to the proposed Ville-Marie Trench Covering project in Montreal.
Documents
Documents